Rated Watchlist, with a fair value of $842.32 against a last close of $827.42 (+1.8% implied upside). A 10.6% fall on 22 October, set off by doubts over how AI data-centre build-outs will be financed, carried the shares into the old $800-860 range, but the same doubts lower the value to $842.32, so new money waits for $745-$790 after 28 October results that hold the 2027 margin path.
- Verdict
- Watchlist
- Fair Value
- $842.32
- Investment Score
- 65.5/100prev 68.6
Technical read (chart only): Confirms as of Breakdown, with a new 60-session closing low on 22 October under a 50-day average that is no longer rising, which agrees with waiting; watch whether the $813.26 low of 22 October holds through the results, and a close back above the 200-day average near $938 followed by a higher low would mark a turn.The Watchlist verdict comes from the fundamentals alone. The technical read looks only at the price chart. It does not change the verdict or the score and only guides entry timing.
Investment Scorecard
Composite score 65.5/100 (previous 68.6). Every factor is scored out of 10, ten always being the best outcome, including for risk.
| Factor | Score | Weight | Change | Basis |
|---|---|---|---|---|
| Business Quality | 8/10 | 15% | unchanged | Heavy-duty gas turbines and grid equipment sold into a three-supplier market, a large installed base and $176bn of backlog; Wind still loses money. |
| Financial Strength | 7/10 | 15% | -1 vs last report | Net cash of about $10.3bn, but first-half operating cash flow excluding the $13.7bn contract-liability build was about -$3.0bn (our calculation); the doubts about customer financing raised on 22 October put more weight on that dependence. |
| Competitive Advantage | 8/10 | 15% | unchanged | Durable in services and turbine technology; the pricing that scarce slots support is temporary, as Siemens Energy and Mitsubishi Heavy add capacity. |
| Management | 7/10 | 10% | unchanged | Revenue and cash guidance raised twice this year and the Vineyard Wind dispute settled, but June-quarter EPS fell short of expectations and the CFO changes on 1 January. |
| Growth Potential | 8/10 | 15% | -1 vs last report | Backlog near $176bn and gas output rising toward 24 GW a year in 2028, but the marginal order source, data-centre developers and hyperscalers, now faces an open financing question. |
| Valuation | 4/10 | 20% | +1 vs last report | About 34-35x 2027 and 24-27x 2028 consensus EPS after the fall to $827.42; the headline cash yield is still mostly customer deposits. |
| Risk (10 = lowest risk) | 4/10 | 10% | unchanged | Results in three trading days settle the 2027 margin question; a 10.6% one-day fall on 22 October shows the multiple remains fragile, which offsets the lower price. |
Recent Developments
| Date | Development | Impact |
|---|---|---|
| 2027 margin on older-vintage backlog 2026 Power margin guide 17%-19%; slots priced in 2024 ship in 2027. Results on 28 October before the market opens. Analyst view (Bank of America, 20 October): third-quarter orders up about 44%. Reading: The input that decides which scenario the shares follow; the range of interest assumes the results do not cut the 2027 Power margin outlook. | Medium | |
| Power and grid frame agreements with Venture Global Up to 16 combined-cycle power islands of 720 MW (about 11.5 GW) with Baker Hughes as co-party, a definitive reservation for 8 units, and a grid frame for up to 21 projects; GE Vernova's share of the value is not disclosed. Venture Global expects its first power-island order by the end of 2026. Reading: Unchanged since 16 October; optional until a purchase order is placed, and a first order would lift the bull-case weight. | Medium | |
| CFO transition Claire McDonough joins as strategic adviser on 1 November and becomes CFO on 1 January 2027; Kenneth Parks retires 2 April 2027. Reading: Orderly, but lands as the 2027 margin bridge is presented. | Low | |
| Songon combined-cycle plant order, Côte d'Ivoire Announced fact: one 9E gas turbine and generator for a 372 MW combined-cycle plant for Songon Energies, with China Energy International Engineering as contractor; booked in the third quarter of 2026; operations scheduled for 2029; value not disclosed; long-term service work is an aim, not a signed contract. Reading: Shows gas demand outside the data-centre market on a frame that does not use scarce H-class slots; too small to size from what was disclosed. | Low | |
| Vineyard Wind settlement Both parties withdrew all claims; terms confidential. GE Vernova had sought more than $300m withheld by the developer. Reading: Removes a litigation overhang in a loss-making segment; no number moves. | Low |
Key Risks
| Risk | Probability | Severity | Comment |
|---|---|---|---|
| Valuation compression | High | High | A 10.6% fall on 22 October with no company news; the multiple reacts to the AI trade and to rates. |
| Data-centre customers slow orders as financing tightens | Medium | High | Raised on 22 October after Meta's spending update; the marginal source of new orders. |
| 2027 margin shortfall | Medium | High | Older-vintage backlog; settled in part on 28 October. |
| Working-capital reversal | Medium | High | First-half operating cash flow excluding the $13.7bn contract-liability build was about -$3.0bn (our calculation). |
| Input-cost inflation on fixed-price backlog | Medium | Medium | Producer prices rose 1.3% in September. |
| CFO transition | Low | Medium | Lands as the 2027 bridge is presented. |
| Counterparty risk on frame agreements | Medium | Low | Venture Global orders depend on its own financing and customers. |
| Balance sheet | Low | Low | Net cash of about $10.3bn. |
Scenario Analysis
| Case | Probability | Fair Value | Outlook |
|---|---|---|---|
| Bull | 22% | $1,156 | The 28 October results show Power margins rising through 2027 toward the 2028 goal, slot pricing holds and the Venture Global and data-centre frames convert to orders; 2028 EPS $34.00, close to the top of the analyst range, at 34x. |
| Base | 50% | $868 | Revenue tracks the $51-53bn 2027 consensus on the existing backlog, margins improve unevenly and earnings growth is weighted to 2028; 2028 EPS $31.00, the low end of the analyst range, at 28x. |
| Bear | 28% | $550 | Older-vintage backlog holds 2027-28 Power margins down and customers slow new reservations as financing for data-centre build-outs tightens; revenue protected by backlog; 2028 EPS $25.00 at 22x. |
The Case
GE Vernova keeps winning orders, with backlog near $176bn and 116 GW of gas backlog and reservations, but the 22 October selloff showed how much of the multiple rests on data-centre customers whose financing is now in question. At 28 times 2028 EPS of $31.00 the base case is $868.00 and the weighted value $842.32, close to the $827.42 price, and the headline free cash flow yield is mostly customer deposits. The rating stays Watchlist, with $745-$790 the range to act on once the 28 October results show whether 2027 margins hold.
Archived Reports